Elsewhere in the state, and armed with a $1.7-million grant from the U.S. Department of Energy, Bill French of Billerica, Mass.-based FDE Hydro LLC set out to create a dam that incorporates non-traditional construction methods with off-site manufacturing and on-site installation. Calling his development “The French Dam,” he wanted to make the entire dam production and installation process both “just-in-time” and weather-independent.